Back to IUST Research Laboratories Network
Main Menu
Masonry arch bridges::
Steel bridges::
SHM of switches::
Contact us::
::
Search in website

Advanced Search
..
:: Project overview ::

Karaj bridge, located on Km 38+000 of Iranian railway network, is a 70 years old unreinforced concrete bridge. The bridge consists of seven spans of 21m, with a total length of 190 meters. The bridge has a width of 4.5 meters and accomodates a single track, with an allowable axle load of 20 tons, and a permissable speed of 80 km/h. Superstructure consists of UIC60 rails, wooden sleepers, and screw fastners. All rail joints on the bridge are welded.

AWT IMAGE

Structural integrity of the bridge is assessed in SLS and ULS. It is concluded that the bridge is capable of withstanding an axle load of 25 tons. Moreover, seismic assessment of bridge suggests that the bridge could withstand longitudinal earthquakes, but requires retrofitting for lateral earthquakes. 

View: 1295 Time(s)   |   Print: 454 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
Click here to see all texts in Karaj topic.
Persian site map - English site map - Created in 0.15 seconds with 45 queries by YEKTAWEB 4665