Intelligent Monitoring of Infrastructures Lab- Km 023+000
Project overview

Clear images and colors

Chief researcher: Dr.Sadegh Marefat (University of Tehran)

Consulting by IMIRL

Bridge on Km 23+000 is a two-span old masonry arch bridge in Iranian railway network. The bridge has been loaded to find out the maximum loading capacity of the bridge. The bridge was instrumented with 7 deflection meters. The bridge managed to withstand a static load of 728 tons. The bridge demonstrated relatively stiff and strong response, despoite initiation of enormous cracks, and it yielded under load levels much greater than the service load.

AWT IMAGE

Topic URL in Intelligent Monitoring of Infrastructures Lab website:
http://rln.iust.ac.ir/find-41.713.557.en.html
Back to content primary page